User Interface: Resource Load Graph

In this article, we are going to take a look at the load graph of each resource.


The load graph shows the load of each resource on each day. Looking at the graph below, you will see the resources on the left side and the loads on the right side in percentage value.

We can also set the color of the graph for easier viewing.  Right-click on the upper-left cell, and select Display settings.

Asprova

Set the Display color expression on the Load Graph tab.

Asprova

Select “Red if over 80%” from the standard registered expressions and click Ok.

Asprova

You will then see that the parts with a heavy load (those with loads greater than 80%) will be displayed in red. You can see both the resources of the Assembly process have a heavy load near the scheduling basis time.

Asprova

Let’s change the unit term of the load. Right-click the date, select Unit term then, 1 week.

Asprova

Now you can see that both the resources of the Assembly process are holding a heavy load all the time.

Asprova

To learn more about Asprova specific to this sample demonstration, you may visit Asprova’s e-Learning videos at http://lib.asprova.com/ (see 23. User Interface). You may also check Online Help on Resource Load Graph.

 