Reschedule Again – Change Scheduling Basis Time

In this sample, we will create a new schedule with the result input and change it to scheduling layout for confirmation. Go to View tab, then Layout Setting, select Scheduling. To change the scheduling basis time, drag and drop the scheduling basis time to November 3rd. You will see that some operations were assigned in […]

Continue Reading

User Interface: Change and Move Operations – Dispatching View

To confirm or adjust operations, we are going to use the dispatching view. Go to Window and Select New Dispatching View option. The Dispatching View shows the time on the vertical axis (see date below) and resources on the horizontal axis (see Assembly below). This is .different from the Resource Gantt chart as it shows […]

Continue Reading

User Interface: Reschedule – Message Window

Assume that all required data settings have been set up already. Run the Reschedule button to get the schedule. The evaluation of the scheduling results will be displayed in the Message window when the rescheduling finishes. See message window at the lower right corner of the screen. The message window can also be enlarged through […]

Continue Reading