Achieving Overall Optimization Through Short, Medium and Long Term Planning

While planning is indeed a basic need to each and every company, it is not an easy feat. Let’s take a look at a ship manufacturer who decided to try Asprova and have experienced four reasons to choose our Finite Capacity Scheduler.

Impressive foresight

In this featured company, in order to keep their equipments running, they relied on professional human planners to make schedules. However, they could only do plans that are 1-2 months ahead. Anything further than that, becomes a workload rather than a detailed and carefully considered plan. This changed when they chose to switch to Asprova. The scheduler helped them create plans that cover up to two years and managed 5000 orders, 6-7 target processes, and 30,000 operations.

An error free schedule

Because of a standardized system that comes along with Asprova, there is little to no room for errors in planning. This is a very important factor that helps maintain high efficiency. Asprova prevents process omissions and shows warnings if time constraints will be breached.

Overall optimization and accuracy

Planning for four months to a year ahead is no joke. It requires accuracy and an in-depth understanding that should be used to adjust delivery dates and carefully predict the upcoming workload. The company, instead of using just excel, switched to Asprova because of it can easily produce accuracy in optimization.

More money

Of course, one of the main goals, if not THE main goal, of the company would be to increase their profits. Even when these are not on the list of reasons of Asprova introduction in the company, lead time reduction, improving cash flow, and inventory reduction are perceived as something that will come to them in the long run with the help of Asprova.